We choose the package from the inside out

Dining room厨房Rest room卧室

Dining room

Dining room, living room balcony standard configuration:

1.Floor: floor or floor tile, including kicking line, floor tile pointing agent

2.Wall, top surface: scraping putty, wall paint (including balcony), gypsum line and installation

3.Balcony floor tile and kick-off line, floor tile pointing agent pointing

4.Install switch and socket panel

5.Floor leveling

6.Material loss, main material handling, garbage removal to downstairs

7.Circuit point modification

8.送Furniture, kitchen electric, soft decoration
010-65561885
点击:Get a free quote in 10 seconds



厨房

Kitchen annotation configuration:

1.Wooden door: solid wood composite set door and door cover, including standard hardware

2.Wall: wall drawing treatment, wall tile, wall tile pointing agent pointing (excluding flower pieces and waist line)

3.Floor: paving tile, tile pointing agent pointing, including door stone

4.Top surface: aluminum buckle ceiling, including edge keel and other accessories, LED lighting

5.Cabinet: unlimited extension meters (only single font or L shape), cabinet body plate package pipeline

6.Install light fixtures, switch socket panels

7.Wall tile Yang Angle strip;
8.Waterway, circuit point transformation
9.送Furniture, kitchen electric, soft decoration





Rest room

Bathroom standard configuration:

1.Bathroom door: aluminum magnesium alloy door, lock, hinge

2.Wall: wall drawing treatment, wall tile, wall tile pointing agent pointing (excluding flower pieces and waist line)

3.Ground: floor tile, floor tile pointing agent pointing, including door stone;
4.Pipe: Light body brick clad pipe

5.Bathroom: toilet, shower, bathroom cabinet combination (finished bathroom cabinet, wash basin, faucet, bathroom mirror)

6.Waterproof: floor, wall waterproof

7.Top surface: aluminum buckle ceiling, including edge keel and other accessories, LED lighting

8.Install lighting, hardware, switch socket panel

9.Wall tile Yang Angle strip;Floor drains;
10.Waterway, circuit point transformation
11.送Furniture, kitchen electric, soft decoration


卧室

Bedroom standard configuration:

1.Wooden door: solid wood composite set door and door cover, including standard hardware

2.Wall, top surface: batch scraping putty, brush wall paint

3.Floor: floor or floor tile, including kicking line, floor tile pointing agent

4.Ground leveling

5.Install switch and socket panel

6.Circuit point modification

7.Send furniture, send kitchen electricity, soft decoration

010-65561885
点击:Get a free quote in 10 seconds

Renowned design team with a variety of styles

Chinese style

European style

American style

Modern simplicity

Elite construction team to create gold diamond project

Selected quality main materials

橱柜开关Wood floor卫浴木门Latex paint瓷砖吊顶

Well-known environmental protection auxiliary material

Characteristic construction technology

Kitchen sun Angle strip technology

The kitchen toilet Yang Angle bar at the layering process, so that the Yang Angle bar at the tile is not easy to damage;

Ground curing dustproof technology

Apply special ground treatment agent on the cement floor to seal loose particles on the cement floor, make the ground base more compact and firm, eliminate dust, and enhance the binding force of decorative materials;

Ceiling Angle anti-cracking technology

Gypsum board ceiling corner, using the whole gypsum board cutting installation, completely solve the ceiling corner cracking problem;

Waterproof all-round brushing process

The pipe roots were sealed, and additional water coating was applied to the corners and roots to achieve the waterproof effect of air permeability, water permeability, toughness and high strength.

Door press stone technology

Avoid deformation or mildew of wood lines due to high humidity and moisture;

Water pipe hot melt connection technology

Hot melt exquisite technology seamless connection, smooth and firm interface, prevent the interface due to temperature changes caused by deformation and leakage phenomenon, extend the service life of pipe fittings;

Toilet floor tile wet paving technology

The ground first do waterproof layer, then do leveling layer, and then paste the floor tile, the ground waterproof layer is not easy to destroy, the floor tile combination layer has high strength, high density and is not easy to permeate water;

Process of reserving access ports for sewer pipes

To avoid the blockage of the sewer pipe in the process of use, the manhole can be opened to facilitate maintenance。

Site investigation and pay-off process

Accurate survey of the construction site, standard level reference line, to provide accurate reference for all construction parts;

Yin-yang Angle protection technology

Special Yin and Yang Angle lines, completely solve the common Yin and Yang Angle bending problem in the construction of latex paint, not only enhance the anti-collision force of the Yang Angle, but also make the Yin and Yang Angle more beautiful;

Decoration service process

01. Online booking

Leave your contact information The staff will contact you as soon as possible

02. Free measure room

Designer home volume room to develop exclusive design scheme

02. Scheme validation

Confirm the solution online or offline You can participate in a special renovation solution

04. Decoration signing

After confirming the plan and quotation, sign the formal decoration contract

05. Start construction

The project manager develops a plan for the team to enter the construction phase

06. Check in

Project manager strict acceptance You can make service evaluation

Online booking

已有11233Person reservation successful

Your name:

Mobile phone number:

House size:

提交

Contact us

Tel: 010-65561885;

Address: D Area, Laijin Cultural Park, Chaoyang Road, Chaoyang District, Beijing

Beijing ICP preparation10020004号-1Beijing public record number: 110105008526

Beijing Jingxing Construction Group Co., LTD

Decoration consultation: 010-65561885;Beijing ICP preparation10020004号-1Beijing public record number: 110105008526

Toll-free hotline
010-65561885